LIRR extra eastbound trains before snow - Los Angeles News | FOX 11 LA KTTV

LIRR extra eastbound trains before snow

Posted: Updated:

The Long Island Rail Road is offering eight extra eastbound trains for people trying to get home before the next snowstorm.

The extra LIRR service will run from roughly 2 to 4 p.m. Wednesday.

The National Weather Service has issued a winter weather advisory starting at 5 p.m.

It says another 3 to 5 inches of snow could fall on eastern Long Island.

 Babylon Branch

· A 2:32 PM departure from Penn Station due in Babylon at 3:45 PM, running express to Lynbrook and then all local stops to Babylon.

· A 3:00 PM departure from Penn Station due in Babylon at 4:12 PM with stops at Jamaica and Rockville Centre and then all local stops to Babylon.

· A 3:31 PM departure from Penn Station due in Babylon at 4:39 PM, running express to Rockville Centre and then all local stops to Babylon

 Port Jefferson Branch:

· The train that normally originates at Huntington at 2:50 PM bound for Port Jefferson, will instead originate at 1:46 PM from Jamaica, making the Huntington stop at 2;50 PM and all stops to Port Jefferson, arriving at 3:37 PM.

· A 2:08 PM departure from Penn Station due in Huntington at 3:09 PM with stops at Jamaica and Carle Place and then all local stops to Huntington

· A 2:29 PM departure from Penn Station due in Huntington at 3:35 PM with stops at Forest Hills, Kew Gardens, Jamaica, New Hyde Park and then all local stops to Huntington.

· A 3:24 PM departure from Penn Station due in Hicksville at 4:05 PM with stops at Jamaica, Mineola Westbury and Hicksville.

 Port Washington Branch

· A 3:40 PM departure from Penn Station due in Great Neck at 4:15 PM with stops at Woodside, Flushing Main St. and then all stops to Great Neck.

 Far Rockaway Branch

· A 3:48 PM departure from Penn Station due in Far Rockaway at 4:43 PM running express to Locust Manor and then all stops to Far Rockaway.

Some parts of Long Island are still digging out from the 30 inches of snow that accumulated during the last storm.

  • TrafficMore>>

  • 2 upper level GWB east lanes closed for repairs

    2 upper level GWB east lanes closed for repairs

    Tuesday, July 22 2014 1:19 PM EDT2014-07-22 17:19:59 GMT
    Workers have closed two upper level eastbound lanes on the George Washington Bridge for emergency repairs. The closures affect New York City bound motorists. Officials expect the lanes will remain closed until 3 p.m. Tuesday. Motorists heading into New York City should use the lower level or consider alternate Hudson River crossings.
    Workers have closed two upper level eastbound lanes on the George Washington Bridge for emergency repairs. The closures affect New York City bound motorists. Officials expect the lanes will remain closed until 3 p.m. Tuesday. Motorists heading into New York City should use the lower level or consider alternate Hudson River crossings.
  • Funeral held for NJ cop killed in crash

    Funeral held for NJ cop killed in crash

    Thousands gathered in northern New Jersey on Tuesday to remember Police Officer Christopher Goodell.   SkyFox HD was over the funeral procession into St. Luke's Church in Ho-Ho-Kus. Mourners including police officers from across the state lined the driveway of the church as the service began for the Waldwick officer killed by a tractor-trailer last week.
    Thousands gathered in northern New Jersey on Tuesday to remember Police Officer Christopher Goodell.   SkyFox HD was over the funeral procession into St. Luke's Church in Ho-Ho-Kus. Mourners including police officers from across the state lined the driveway of the church as the service began for the Waldwick officer killed by a tractor-trailer last week.
  • Repaving of Palisades Parkway begins

    Repaving of Palisades Parkway begins

    Monday, July 21 2014 10:42 PM EDT2014-07-22 02:42:19 GMT
    Crews have begun repaving along the Palisades Interstate Parkway. The last time such work was done on the road, which links New York state to the George Washington Bridge, was the mid-1990s.
    Crews have begun repaving along the Palisades Interstate Parkway. The last time such work was done on the road, which links New York state to the George Washington Bridge, was the mid-1990s.
Powered by WorldNow

KTTV FOX 11
1999 S. Bundy Dr.
Los Angeles CA 90025

Main: (310) 584-2000
News Tips? (310) 584-2025

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices