Metro-North schedule for Monday - Los Angeles News | FOX 11 LA KTTV

Metro-North schedule for Monday

Posted: Updated:
MYFOXNY.COM -

The Connecticut Department of Transportation and Metro-North Railroad released the following information regarding service on the New Haven commuter rail line, in the wake of the May 17 derailment in Bridgeport. The service plan requires buses in some locations. Customers should understand that their commuting times will be considerably longer in many cases. 

The following is effective Monday, May 20, and until further notice. 

AM Peak to Grand Central

  • A shuttle train operating approximately every 20 minutes between New Haven and Bridgeport Station
  • Between Bridgeport and Stamford Stations, two bus shuttles will operate:
  • Limited train service from Westport Station
  • Regular train service from South Norwalk Station to Grand Central Terminal
  1. Express service from Bridgeport to Stamford Station with regular train connections to Grand Central Terminal
  2. Local service between Bridgeport, Fairfield Metro, Fairfield and Westport Stations (no bus service from Green's Farms and Southport Stations)

 AM & PM Reverse Peak/Off-Peak Service

  • For the AM/PM Peak: Limited train service between Grand Central Terminal and Westport Station
  • For the Off-Peak: Regular train service between Grand Central Terminal and Westport Station
  • Loop bus service with connections between Bridgeport, Fairfield, Fairfield Metro and Westport Stations (no bus service from Green's Farms and Southport Stations)
  • Express buses between Bridgeport and South Norwalk
  1. A train shuttle operating approximately every 20 minutes between Bridgeport and New Haven Stations

 PM Peak to New Haven

  • Regular train service from Grand Central Terminal to South Norwalk Station
  • Express bus service from South Norwalk to Bridgeport Station
  • Limited train service from Grand Central Terminal to Westport Station
  • Local bus shuttle service between Westport, Fairfield, Fairfield Metro and Bridgeport Stations (no bus service from Green's Farms and Southport Stations)
  • A train shuttle operating approximately every 20 minutes between Bridgeport and New Haven Stations

Regular train service will operate on the New Canaan, Danbury and Waterbury Branches.

For train schedule information, please refer to the schedules page at www.mta.info  or the Connecticut DOT website, http://www.ct.gov/dot. 

Customers should know before they go:

  • Travel times will be significantly longer than normal and trains will be significantly crowded
  • Metro-North representatives will be at major New Haven Line (NHL) stations to assist customers
  • NHL Customers east of South Norwalk are encouraged to seek alternative ways to get to and from work or stagger their work schedule
  • If possible, customers are advised to use the Harlem Line as an alternative. NHL rail tickets will be cross-honored
  • ConnDOT will cross-honor NHL pre-paid rail tickets (as a temporary Bus/Rail uniticket) on I-95 Corridor Bus Service
  • Metro-North will cross-honor Amtrak tickets
  • TrafficMore>>

  • Port Authority to plan for new bus terminal

    Port Authority to plan for new bus terminal

    Wednesday, July 23 2014 3:02 PM EDT2014-07-23 19:02:29 GMT
    The Port Authority of New York and New Jersey is discussing a new main bus terminal. The 64-year-old Port Authority Bus Terminal in Manhattan has come under criticism from New Jersey lawmakers who say their constituents have to deal with long delays, substandard conditions and a lack of communication.
    The Port Authority of New York and New Jersey is discussing a new main bus terminal. The 64-year-old Port Authority Bus Terminal in Manhattan has come under criticism from New Jersey lawmakers who say their constituents have to deal with long delays, substandard conditions and a lack of communication.
  • 2 upper level GWB east lanes closed for repairs

    2 upper level GWB east lanes closed for repairs

    Tuesday, July 22 2014 1:19 PM EDT2014-07-22 17:19:59 GMT
    Workers have closed two upper level eastbound lanes on the George Washington Bridge for emergency repairs. The closures affect New York City bound motorists. Officials expect the lanes will remain closed until 3 p.m. Tuesday. Motorists heading into New York City should use the lower level or consider alternate Hudson River crossings.
    Workers have closed two upper level eastbound lanes on the George Washington Bridge for emergency repairs. The closures affect New York City bound motorists. Officials expect the lanes will remain closed until 3 p.m. Tuesday. Motorists heading into New York City should use the lower level or consider alternate Hudson River crossings.
  • Repaving of Palisades Parkway begins

    Repaving of Palisades Parkway begins

    Monday, July 21 2014 10:42 PM EDT2014-07-22 02:42:19 GMT
    Crews have begun repaving along the Palisades Interstate Parkway. The last time such work was done on the road, which links New York state to the George Washington Bridge, was the mid-1990s.
    Crews have begun repaving along the Palisades Interstate Parkway. The last time such work was done on the road, which links New York state to the George Washington Bridge, was the mid-1990s.
Powered by WorldNow

KTTV FOX 11
1999 S. Bundy Dr.
Los Angeles CA 90025

Main: (310) 584-2000
News Tips? (310) 584-2025

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices